Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

EM Energized Membrane II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
291,245.30
ISK
Sell Value
348,000.00
Profit
+56,754.70
ISK
Margin
16.3%
Build Time
19m 9s
1 run

Materials

6 items
Material Quantity Unit Price Total
5 108,026.60
3 124,781.76
1 10,010.00
1 603.62
3 13,822.56
3 18,159.00
Material Total 275,403.54
System Cost Index (0.14%) 535.71
SCC Surcharge (4%) 15,306.05
Job Installation Cost 15,841.76
Grand Total 291,245.30

Production Timeline

d
Assembly 19m 9s
1
EM Energized Membrane II
EM Energized Membrane II M
1 job, 1 run 19m 9s/job 19m 9s
Total Wall Clock Time 19m 9s