Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Thermal Energized Membrane II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
298,769.17
ISK
Sell Value
271,759.30
Profit
-27,009.87
ISK
Margin
-9.9%
Build Time
19m 9s
1 run

Materials

5 items
Material Quantity Unit Price Total
5 94,151.35
3 132,077.25
1 605.32
6 34,885.98
1 23,690.00
Material Total 285,409.90
System Cost Index (0.14%) 451.76
SCC Surcharge (4%) 12,907.50
Job Installation Cost 13,359.27
Grand Total 298,769.17

Production Timeline

d
Assembly 19m 9s
1
Thermal Energized Membrane II
Thermal Energized Membrane II M
1 job, 1 run 19m 9s/job 19m 9s
Total Wall Clock Time 19m 9s