Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

200mm Steel Plates I Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
146,497.81
ISK
Sell Value
199,445.53
Profit
+52,947.72
ISK
Margin
26.5%
Build Time
8m 10s
1 run

Materials

6 items
Material Quantity Unit Price Total
4,720 17,652.80
2,844 51,988.32
758 43,675.96
18 13,388.76
6 8,655.84
2 5,861.60
Material Total 141,223.28
System Cost Index (0.14%) 178.37
SCC Surcharge (4%) 5,096.16
Job Installation Cost 5,274.53
Grand Total 146,497.81

Production Timeline

d
Assembly 8m 10s
1
200mm Steel Plates I
200mm Steel Plates I M
1 job, 1 run 8m 10s/job 8m 10s
Total Wall Clock Time 8m 10s

Required Skills