Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

800mm Steel Plates I Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
764,232.78
ISK
Sell Value
737,129.94
Profit
-27,102.84
ISK
Margin
-3.7%
Build Time
16m 20s
1 run

Materials

6 items
Material Quantity Unit Price Total
10,997 41,128.78
10,435 190,751.80
7,524 433,532.88
208 49,996.96
6 4,462.92
6 17,584.80
Material Total 737,458.14
System Cost Index (0.14%) 905.42
SCC Surcharge (4%) 25,869.22
Job Installation Cost 26,774.64
Grand Total 764,232.78

Production Timeline

d
Assembly 16m 20s
1
800mm Steel Plates I
800mm Steel Plates I M
1 job, 1 run 16m 20s/job 16m 20s
Total Wall Clock Time 16m 20s

Required Skills