Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Nemesis Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
13,773,339.04
ISK
Sell Value
14,778,306.88
Profit
+1,004,967.84
ISK
Margin
6.8%
Build Time
15h 32m 50s
1 run

Materials

11 items
Material Quantity Unit Price Total
54 1,651,660.74
35 657,866.65
14 333,730.88
54 898,054.02
Tristan
1 477,648.15
27 247,868.10
162 5,904,637.56
3 1,904.07
27 702,452.52
270 1,569,869.10
6 792,649.20
Material Total 13,238,340.99
System Cost Index (0.14%) 18,091.72
SCC Surcharge (4%) 516,906.33
Job Installation Cost 534,998.05
Grand Total 13,773,339.04

Production Timeline

d
Assembly 15h 32m 50s
1
Nemesis
Nemesis M
1 job, 1 run 15h 32m 50s/job 15h 32m 50s
Total Wall Clock Time 15h 32m 50s