Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Hyena Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
15,282,387.25
ISK
Sell Value
16,110,000.00
Profit
+827,612.75
ISK
Margin
5.1%
Build Time
15h 32m 50s
1 run

Materials

11 items
Material Quantity Unit Price Total
Vigil
1 190,143.48
27 816,882.30
14 302,474.48
338 1,604,533.32
68 1,558,678.32
135 6,499,392.75
14 395,699.50
21 199,392.48
6 3,581.16
68 2,810,986.04
3 351,311.76
Material Total 14,733,075.59
System Cost Index (0.14%) 18,575.76
SCC Surcharge (4%) 530,735.90
Job Installation Cost 549,311.66
Grand Total 15,282,387.25

Production Timeline

d
Assembly 15h 32m 50s
1
Hyena
Hyena M
1 job, 1 run 15h 32m 50s/job 15h 32m 50s
Total Wall Clock Time 15h 32m 50s