Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Heat Sink I Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
30,628.38
ISK
Sell Value
69,954.75
Profit
+39,326.37
ISK
Margin
56.2%
Build Time
8m 10s
1 run

Materials

5 items
Material Quantity Unit Price Total
2 4,944.22
609 2,320.29
287 14,097.44
2 364.28
6 7,758.84
Material Total 29,485.07
System Cost Index (0.14%) 38.66
SCC Surcharge (4%) 1,104.65
Job Installation Cost 1,143.31
Grand Total 30,628.38

Production Timeline

d
Assembly 8m 10s
1
Heat Sink I
Heat Sink I M
1 job, 1 run 8m 10s/job 8m 10s
Total Wall Clock Time 8m 10s

Required Skills