Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Gravimetric ECM I Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
31,176.45
ISK
Sell Value
57,471.98
Profit
+26,295.53
ISK
Margin
45.8%
Build Time
16m 20s
1 run

Materials

3 items
Material Quantity Unit Price Total
2 4,944.22
2,596 9,890.76
828 15,326.28
Material Total 30,161.26
System Cost Index (0.14%) 34.33
SCC Surcharge (4%) 980.86
Job Installation Cost 1,015.19
Grand Total 31,176.45

Production Timeline

d
Assembly 16m 20s
1
Gravimetric ECM I
Gravimetric ECM I M
1 job, 1 run 16m 20s/job 16m 20s
Total Wall Clock Time 16m 20s

Required Skills