Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Infrared L Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
46,461.65
ISK
Sell Value
24,000.00
Profit
-22,461.65
ISK
Margin
-93.6%
Build Time
8m 10s
1 run

Materials

6 items
Material Quantity Unit Price Total
9 164.52
99 5,706.36
4 961.52
4 2,942.36
2 2,886.16
11 32,322.07
Material Total 44,982.99
System Cost Index (0.14%) 50.00
SCC Surcharge (4%) 1,428.66
Job Installation Cost 1,478.66
Grand Total 46,461.65

Production Timeline

d
Assembly 8m 10s
1
Infrared L
Infrared L M
1 job, 1 run 8m 10s/job 8m 10s
Total Wall Clock Time 8m 10s

Required Skills