Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Falcon Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
139,209,767.35
ISK
Sell Value
149,800,000.00
Profit
+10,590,232.65
ISK
Margin
7.1%
Build Time
1d 7h 5m
1 run

Materials

11 items
Material Quantity Unit Price Total
338 16,124,161.56
135 2,535,906.15
52 1,370,865.60
446 8,206,400.00
3,375 17,006,928.75
68 624,463.04
17 10,789.56
Blackbird
1 8,007,735.29
1,620 67,873,464.00
270 8,621,899.20
27 3,371,025.06
Material Total 133,753,638.21
System Cost Index (0.14%) 184,506.78
SCC Surcharge (4%) 5,271,622.35
Job Installation Cost 5,456,129.14
Grand Total 139,209,767.35

Production Timeline

d
Assembly 1d 7h 5m
1
Falcon
Falcon M
1 job, 1 run 1d 7h 5m/job 1d 7h 5m
Total Wall Clock Time 1d 7h 5m