Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Pilgrim Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
141,865,023.02
ISK
Sell Value
152,959,016.39
Profit
+11,093,993.37
ISK
Margin
7.3%
Build Time
1d 7h 5m
1 run

Materials

11 items
Material Quantity Unit Price Total
135 2,557,600.65
52 1,499,160.00
338 14,266,516.94
446 8,416,020.00
1,620 68,895,230.40
1 8,384,000.00
17 10,565.50
3,375 20,058,502.50
68 632,400.00
27 3,851,120.97
270 7,913,835.00
Material Total 136,484,951.96
System Cost Index (0.14%) 181,934.77
SCC Surcharge (4%) 5,198,136.29
Job Installation Cost 5,380,071.06
Grand Total 141,865,023.02

Production Timeline

d
Assembly 1d 7h 5m
1
Pilgrim
Pilgrim M
1 job, 1 run 1d 7h 5m/job 1d 7h 5m
Total Wall Clock Time 1d 7h 5m