Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Pilgrim Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
136,778,335.10
ISK
Sell Value
134,992,779.78
Profit
-1,785,555.32
ISK
Margin
-1.3%
Build Time
1d 7h 5m
1 run

Materials

11 items
Material Quantity Unit Price Total
135 2,903,682.60
52 1,513,200.00
338 14,054,026.48
446 8,865,730.72
1,620 70,038,043.20
1 8,189,000.00
17 10,146.62
3,375 15,548,625.00
68 653,412.00
27 2,988,955.89
270 6,630,552.00
Material Total 131,395,374.51
System Cost Index (0.14%) 182,032.48
SCC Surcharge (4%) 5,200,928.11
Job Installation Cost 5,382,960.59
Grand Total 136,778,335.10

Production Timeline

d
Assembly 1d 7h 5m
1
Pilgrim
Pilgrim M
1 job, 1 run 1d 7h 5m/job 1d 7h 5m
Total Wall Clock Time 1d 7h 5m