Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Onyx Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
211,674,990.79
ISK
Sell Value
224,798,319.33
Profit
+13,123,328.54
ISK
Margin
5.8%
Build Time
1d 7h 5m
1 run

Materials

11 items
Material Quantity Unit Price Total
594 21,450,896.28
135 2,916,718.20
95 1,948,450.00
162 3,277,260.00
Moa
1 11,060,000.00
170 1,614,129.60
19 11,340.34
6,075 36,771,975.00
2,673 108,280,797.57
372 10,843,450.32
48 4,772,162.88
Material Total 202,947,180.19
System Cost Index (0.14%) 295,143.35
SCC Surcharge (4%) 8,432,667.24
Job Installation Cost 8,727,810.60
Grand Total 211,674,990.79

Production Timeline

d
Assembly 1d 7h 5m
1
Onyx
Onyx M
1 job, 1 run 1d 7h 5m/job 1d 7h 5m
Total Wall Clock Time 1d 7h 5m