Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Vagabond Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
145,948,430.40
ISK
Sell Value
155,676,190.48
Profit
+9,727,760.08
ISK
Margin
6.2%
Build Time
1d 7h 5m
1 run

Materials

11 items
Material Quantity Unit Price Total
68 2,053,850.24
135 2,903,845.95
Stabber
1 11,359,171.27
5,063 24,034,769.82
359 8,228,904.66
1,215 58,708,739.25
405 11,447,021.25
135 1,281,630.60
17 10,146.62
35 4,096,818.25
405 16,741,902.15
Material Total 140,866,800.06
System Cost Index (0.14%) 171,842.57
SCC Surcharge (4%) 4,909,787.77
Job Installation Cost 5,081,630.34
Grand Total 145,948,430.40

Production Timeline

d
Assembly 1d 7h 5m
1
Vagabond
Vagabond M
1 job, 1 run 1d 7h 5m/job 1d 7h 5m
Total Wall Clock Time 1d 7h 5m