Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Vagabond Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
125,186,498.03
ISK
Sell Value
157,921,739.13
Profit
+32,735,241.10
ISK
Margin
20.7%
Build Time
1d 7h 5m
1 run

Materials

11 items
Material Quantity Unit Price Total
68 2,153,744.96
135 2,537,485.65
Stabber
1 11,480,000.00
5,063 24,432,620.36
359 6,005,965.89
1,215 46,065,133.35
405 9,777,117.15
135 1,239,340.50
17 10,789.73
35 4,487,000.00
405 12,334,744.80
Material Total 120,523,942.39
System Cost Index (0.14%) 157,670.96
SCC Surcharge (4%) 4,504,884.68
Job Installation Cost 4,662,555.64
Grand Total 125,186,498.03

Production Timeline

d
Assembly 1d 7h 5m
1
Vagabond
Vagabond M
1 job, 1 run 1d 7h 5m/job 1d 7h 5m
Total Wall Clock Time 1d 7h 5m