Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Zealot Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
135,088,867.94
ISK
Sell Value
138,750,000.00
Profit
+3,661,132.06
ISK
Margin
2.6%
Build Time
1d 7h 5m
1 run

Materials

11 items
Material Quantity Unit Price Total
Omen
1 9,852,709.22
135 2,903,682.60
68 1,978,800.00
405 16,839,883.80
359 7,136,316.88
1,215 52,528,532.40
135 1,297,215.00
17 10,146.62
5,063 23,325,241.00
405 9,945,828.00
35 3,874,572.45
Material Total 129,692,927.97
System Cost Index (0.14%) 182,471.40
SCC Surcharge (4%) 5,213,468.57
Job Installation Cost 5,395,939.97
Grand Total 135,088,867.94

Production Timeline

d
Assembly 1d 7h 5m
1
Zealot
Zealot M
1 job, 1 run 1d 7h 5m/job 1d 7h 5m
Total Wall Clock Time 1d 7h 5m