Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Zealot Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
137,886,232.02
ISK
Sell Value
144,453,979.24
Profit
+6,567,747.22
ISK
Margin
4.5%
Build Time
1d 7h 5m
1 run

Materials

11 items
Material Quantity Unit Price Total
Omen
1 6,500,761.90
135 2,612,947.95
68 1,960,469.24
405 17,096,370.30
359 6,739,743.94
1,215 49,304,700.00
135 1,238,207.85
17 10,874.56
5,063 30,164,240.14
405 11,922,244.20
35 4,880,405.95
Material Total 132,430,966.03
System Cost Index (0.14%) 184,477.59
SCC Surcharge (4%) 5,270,788.39
Job Installation Cost 5,455,265.99
Grand Total 137,886,232.02

Production Timeline

d
Assembly 1d 7h 5m
1
Zealot
Zealot M
1 job, 1 run 1d 7h 5m/job 1d 7h 5m
Total Wall Clock Time 1d 7h 5m