Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Devoter Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
217,021,749.89
ISK
Sell Value
228,848,275.86
Profit
+11,826,525.97
ISK
Margin
5.2%
Build Time
1d 7h 5m
1 run

Materials

11 items
Material Quantity Unit Price Total
135 2,612,947.95
95 2,738,890.85
594 25,074,676.44
Maller
1 11,180,000.00
162 3,041,332.92
2,673 108,470,340.00
170 1,559,224.70
19 12,153.92
6,075 36,193,513.50
48 6,693,128.16
372 10,950,802.08
Material Total 208,527,010.52
System Cost Index (0.14%) 287,261.72
SCC Surcharge (4%) 8,207,477.65
Job Installation Cost 8,494,739.37
Grand Total 217,021,749.89

Production Timeline

d
Assembly 1d 7h 5m
1
Devoter
Devoter M
1 job, 1 run 1d 7h 5m/job 1d 7h 5m
Total Wall Clock Time 1d 7h 5m