Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Sacrilege Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
140,358,558.41
ISK
Sell Value
162,473,399.01
Profit
+22,114,840.60
ISK
Margin
13.6%
Build Time
1d 7h 5m
1 run

Materials

11 items
Material Quantity Unit Price Total
135 2,903,682.60
68 1,978,800.00
540 22,453,178.40
Maller
1 12,330,000.00
149 2,961,869.68
1,215 52,528,532.40
170 1,633,530.00
17 10,146.62
5,063 23,325,241.00
41 4,538,784.87
405 9,945,828.00
Material Total 134,609,593.57
System Cost Index (0.14%) 194,409.44
SCC Surcharge (4%) 5,554,555.40
Job Installation Cost 5,748,964.84
Grand Total 140,358,558.41

Production Timeline

d
Assembly 1d 7h 5m
1
Sacrilege
Sacrilege M
1 job, 1 run 1d 7h 5m/job 1d 7h 5m
Total Wall Clock Time 1d 7h 5m