Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Phobos Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
195,544,974.31
ISK
Sell Value
198,082,926.83
Profit
+2,537,952.52
ISK
Margin
1.3%
Build Time
1d 7h 5m
1 run

Materials

11 items
Material Quantity Unit Price Total
594 18,168,268.14
135 2,537,485.65
372 8,867,706.24
162 2,694,162.06
Thorax
1 12,354,316.55
170 1,560,651.00
2,673 97,426,519.74
19 12,059.11
95 2,471,592.20
6,075 35,322,054.75
48 6,341,193.60
Material Total 187,756,009.04
System Cost Index (0.14%) 263,394.96
SCC Surcharge (4%) 7,525,570.31
Job Installation Cost 7,788,965.27
Grand Total 195,544,974.31

Production Timeline

d
Assembly 1d 7h 5m
1
Phobos
Phobos M
1 job, 1 run 1d 7h 5m/job 1d 7h 5m
Total Wall Clock Time 1d 7h 5m