Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Phobos Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
186,930,178.04
ISK
Sell Value
190,809,523.81
Profit
+3,879,345.77
ISK
Margin
2.0%
Build Time
1d 7h 5m
1 run

Materials

11 items
Material Quantity Unit Price Total
594 19,506,728.34
135 2,903,682.60
372 9,110,354.40
162 2,937,094.02
Thorax
1 10,971,369.86
170 1,633,530.00
2,673 90,017,150.85
19 11,340.34
95 2,725,550.00
6,075 34,639,650.00
48 4,635,436.80
Material Total 179,091,887.21
System Cost Index (0.14%) 265,062.97
SCC Surcharge (4%) 7,573,227.85
Job Installation Cost 7,838,290.83
Grand Total 186,930,178.04

Production Timeline

d
Assembly 1d 7h 5m
1
Phobos
Phobos M
1 job, 1 run 1d 7h 5m/job 1d 7h 5m
Total Wall Clock Time 1d 7h 5m