Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Heavy Energy Neutralizer I Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
590,349.62
ISK
Sell Value
979,700.00
Profit
+389,350.38
ISK
Margin
39.7%
Build Time
24m 29s
1 run

Materials

6 items
Material Quantity Unit Price Total
1,338 5,097.78
1,338 24,766.38
1,338 65,722.56
1,338 243,703.32
90 116,382.60
44 108,772.84
Material Total 564,445.48
System Cost Index (0.14%) 875.99
SCC Surcharge (4%) 25,028.16
Job Installation Cost 25,904.14
Grand Total 590,349.62

Production Timeline

d
Assembly 24m 29s
1
Heavy Energy Neutralizer I
Heavy Energy Neutralizer I M
1 job, 1 run 24m 29s/job 24m 29s
Total Wall Clock Time 24m 29s

Required Skills