Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Ballistic Control System I Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
62,617.29
ISK
Sell Value
90,000.00
Profit
+27,382.71
ISK
Margin
30.4%
Build Time
8m 10s
1 run

Materials

5 items
Material Quantity Unit Price Total
4 9,888.44
1,216 4,632.96
573 28,145.76
4 728.56
13 16,810.82
Material Total 60,206.54
System Cost Index (0.14%) 81.52
SCC Surcharge (4%) 2,329.23
Job Installation Cost 2,410.75
Grand Total 62,617.29

Production Timeline

d
Assembly 8m 10s
1
Ballistic Control System I
Ballistic Control System I M
1 job, 1 run 8m 10s/job 8m 10s
Total Wall Clock Time 8m 10s

Required Skills