Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

200mm Railgun II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
907,589.85
ISK
Sell Value
997,742.19
Profit
+90,152.34
ISK
Margin
9.0%
Build Time
38m 18s
1 run

Materials

5 items
Material Quantity Unit Price Total
16 313,120.00
5 107,549.85
5 411,386.00
1 36,970.00
1 653.79
Material Total 869,679.64
System Cost Index (0.14%) 1,281.99
SCC Surcharge (4%) 36,628.22
Job Installation Cost 37,910.21
Grand Total 907,589.85

Production Timeline

d
Assembly 38m 18s
1
200mm Railgun II
200mm Railgun II M
1 job, 1 run 38m 18s/job 38m 18s
Total Wall Clock Time 38m 18s

Required Skills