Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Prorator Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
88,542,104.57
ISK
Sell Value
109,000,000.00
Profit
+20,457,895.43
ISK
Margin
18.8%
Build Time
1d 7h 5m
1 run

Materials

11 items
Material Quantity Unit Price Total
Sigil
1 1,413,000.00
54 1,047,200.40
102 2,942,700.00
203 8,569,281.63
81 1,520,666.46
1,080 43,826,400.00
102 935,544.00
10 6,396.80
2,700 16,090,839.00
35 4,880,405.95
135 3,975,795.90
Material Total 85,208,230.14
System Cost Index (0.14%) 112,739.71
SCC Surcharge (4%) 3,221,134.71
Job Installation Cost 3,333,874.43
Grand Total 88,542,104.57

Production Timeline

d
Assembly 1d 7h 5m
1
Prorator
Prorator M
1 job, 1 run 1d 7h 5m/job 1d 7h 5m
Total Wall Clock Time 1d 7h 5m