Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Layered Coating II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
59,263.63
ISK
Sell Value
995,516.27
Profit
+936,252.64
ISK
Margin
94.0%
Build Time
19m 9s
1 run

Materials

5 items
Material Quantity Unit Price Total
1 21,509.97
1 603.62
3 13,821.00
3 18,159.00
1 2,178.97
Material Total 56,272.56
System Cost Index (0.14%) 101.15
SCC Surcharge (4%) 2,889.93
Job Installation Cost 2,991.07
Grand Total 59,263.63

Production Timeline

d
Assembly 19m 9s
1
Layered Coating II
Layered Coating II M
1 job, 1 run 19m 9s/job 19m 9s
Total Wall Clock Time 19m 9s