Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Barrage L Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
1,239,728.79
ISK
Sell Value
1,825,000.00
Profit
+585,271.21
ISK
Margin
32.1%
Build Time
1h 57m 50s
1 run

Materials

4 items
Material Quantity Unit Price Total
2,700 131,814.00
1,080 777,081.60
1 660.90
14 263,146.66
Material Total 1,172,703.16
System Cost Index (0.14%) 2,266.57
SCC Surcharge (4%) 64,759.06
Job Installation Cost 67,025.63
Grand Total 1,239,728.79

Production Timeline

d
Assembly 1h 57m 50s
1
Barrage L
Barrage L M
1 job, 1 run 1h 57m 50s/job 1h 57m 50s
Total Wall Clock Time 1h 57m 50s

Required Skills