Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Hail L Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
1,305,234.76
ISK
Sell Value
1,900,000.00
Profit
+594,765.24
ISK
Margin
31.3%
Build Time
1h 57m 50s
1 run

Materials

4 items
Material Quantity Unit Price Total
2,700 120,123.00
1,080 817,020.00
1 652.98
14 302,474.48
Material Total 1,240,270.46
System Cost Index (0.14%) 2,196.86
SCC Surcharge (4%) 62,767.44
Job Installation Cost 64,964.30
Grand Total 1,305,234.76

Production Timeline

d
Assembly 1h 57m 50s
1
Hail L
Hail L M
1 job, 1 run 1h 57m 50s/job 1h 57m 50s
Total Wall Clock Time 1h 57m 50s

Required Skills