Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Void L Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
783,915.69
ISK
Sell Value
1,229,900.00
Profit
+445,984.31
ISK
Margin
36.3%
Build Time
1h 57m 50s
1 run

Materials

4 items
Material Quantity Unit Price Total
540 408,223.80
1 652.98
540 37,459.80
14 301,139.58
Material Total 747,476.16
System Cost Index (0.14%) 1,232.25
SCC Surcharge (4%) 35,207.28
Job Installation Cost 36,439.53
Grand Total 783,915.69

Production Timeline

d
Assembly 1h 57m 50s
1
Void L
Void L M
1 job, 1 run 1h 57m 50s/job 1h 57m 50s
Total Wall Clock Time 1h 57m 50s

Required Skills