Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Federation Navy Thermal Energized Membrane Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
155,091.37
ISK
Sell Value
1,246,000.00
Profit
+1,090,908.63
ISK
Margin
87.6%
Build Time
8m 10s
1 run

Materials

5 items
Material Quantity Unit Price Total
2 5,861.60
9,161 34,262.14
5,845 106,846.60
7 403.34
3 2,231.46
Material Total 149,605.14
System Cost Index (0.14%) 185.52
SCC Surcharge (4%) 5,300.71
Job Installation Cost 5,486.23
Grand Total 155,091.37

Production Timeline

d
Assembly 8m 10s
1
Federation Navy Thermal Energized Membrane
Federation Navy Thermal Energized Membrane M
1 job, 1 run 8m 10s/job 8m 10s
Total Wall Clock Time 8m 10s

Required Skills