Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Cynabal Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
136,382,663.89
ISK
Sell Value
202,947,368.42
Profit
+66,564,704.53
ISK
Margin
32.8%
Build Time
1h 48m 49s
1 run

Materials

10 items
Material Quantity Unit Price Total
27 2,191,594.59
54 2,467,974.96
54 116,188,700.40
540 1,578,193.20
1,080 1,558,051.20
1,620 1,204,745.40
10,800 2,596,860.00
38,880 2,240,265.60
194,400 3,553,632.00
583,200 2,181,168.00
Material Total 135,761,185.35
System Cost Index (0.14%) 21,016.18
SCC Surcharge (4%) 600,462.36
Job Installation Cost 621,478.54
Grand Total 136,382,663.89

Production Timeline

d
Assembly 1h 48m 49s
1
Cynabal
Cynabal M
1 job, 1 run 1h 48m 49s/job 1h 48m 49s
Total Wall Clock Time 1h 48m 49s

Required Skills