Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Mercoxit Asteroid Mining Crystal Type A II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
680,184.32
ISK
Sell Value
1,053,024.65
Profit
+372,840.33
ISK
Margin
35.4%
Build Time
3m 56s
1 run

Materials

3 items
Material Quantity Unit Price Total
1 411.50
1 409,918.52
36 251,367.48
Material Total 661,697.50
System Cost Index (0.14%) 625.16
SCC Surcharge (4%) 17,861.66
Job Installation Cost 18,486.82
Grand Total 680,184.32

Production Timeline

d
Assembly 3m 56s
1
Mercoxit Asteroid Mining Crystal Type A II
Mercoxit Asteroid Mining Crystal Type A II M
1 job, 1 run 3m 56s/job 3m 56s
Total Wall Clock Time 3m 56s