Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Mercoxit Asteroid Mining Crystal Type A II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
677,544.65
ISK
Sell Value
1,337,300.70
Profit
+659,756.05
ISK
Margin
49.3%
Build Time
3m 56s
1 run

Materials

3 items
Material Quantity Unit Price Total
1 494.32
1 433,400.00
36 225,382.68
Material Total 659,277.00
System Cost Index (0.14%) 617.75
SCC Surcharge (4%) 17,649.90
Job Installation Cost 18,267.65
Grand Total 677,544.65

Production Timeline

d
Assembly 3m 56s
1
Mercoxit Asteroid Mining Crystal Type A II
Mercoxit Asteroid Mining Crystal Type A II M
1 job, 1 run 3m 56s/job 3m 56s
Total Wall Clock Time 3m 56s