Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Phoenix Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
2,099,198,330.92
ISK
Sell Value
3,902,000,000.00
Profit
+1,802,801,669.08
ISK
Margin
46.2%
Build Time
12d 14h 13m
1 run

Materials

19 items
Material Quantity Unit Price Total
1 170,675,471.70
1 702,227,659.57
2 20,049,341.82
2 34,600,000.00
2 24,924,123.72
2 29,140,000.00
2 36,484,790.42
2 16,712,287.58
2 28,438,487.40
2 134,204,545.46
4 52,800,000.00
4 56,420,539.16
4 48,200,000.00
4 64,991,284.92
14 133,924,000.00
14 137,246,666.62
15 309,000,000.00
180 14,502,502.80
360 16,563,560.40
Material Total 2,031,105,261.57
System Cost Index (0.14%) 2,302,664.18
SCC Surcharge (4%) 65,790,405.17
Job Installation Cost 68,093,069.35
Grand Total 2,099,198,330.92

Production Timeline

d
Assembly 12d 14h 13m
1
Phoenix
Phoenix M
1 job, 1 run 12d 14h 13m/job 12d 14h 13m
Total Wall Clock Time 12d 14h 13m

Required Skills