Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Obelisk Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
1,449,419,291.03
ISK
Sell Value
1,699,428,571.43
Profit
+250,009,280.40
ISK
Margin
14.7%
Build Time
9d 10h 40m
1 run

Materials

9 items
Material Quantity Unit Price Total
9 129,960,000.00
5 72,738,022.80
41 621,560,000.00
5 35,720,000.00
15 239,400,000.00
1 80,268,965.52
360 16,453,166.40
180 14,610,630.60
1 191,074,074.07
Material Total 1,401,784,859.39
System Cost Index (0.14%) 1,610,826.19
SCC Surcharge (4%) 46,023,605.45
Job Installation Cost 47,634,431.64
Grand Total 1,449,419,291.03

Production Timeline

d
Assembly 9d 10h 40m
1
Obelisk
Obelisk M
1 job, 1 run 9d 10h 40m/job 9d 10h 40m
Total Wall Clock Time 9d 10h 40m

Required Skills