Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Fenrir Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
1,405,313,537.61
ISK
Sell Value
1,433,000,000.00
Profit
+27,686,462.39
ISK
Margin
1.9%
Build Time
9d 10h 40m
1 run

Materials

9 items
Material Quantity Unit Price Total
18 259,920,000.00
5 72,738,022.80
32 485,120,000.00
5 35,710,000.00
15 200,010,242.55
1 82,465,000.00
360 16,453,166.40
180 14,610,630.60
1 191,074,074.07
Material Total 1,358,101,136.42
System Cost Index (0.14%) 1,596,554.63
SCC Surcharge (4%) 45,615,846.56
Job Installation Cost 47,212,401.19
Grand Total 1,405,313,537.61

Production Timeline

d
Assembly 9d 10h 40m
1
Fenrir
Fenrir M
1 job, 1 run 9d 10h 40m/job 9d 10h 40m
Total Wall Clock Time 9d 10h 40m

Required Skills