Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Ballistic Control System II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
670,226.94
ISK
Sell Value
949,109.13
Profit
+278,882.19
ISK
Margin
29.4%
Build Time
19m 9s
1 run

Materials

6 items
Material Quantity Unit Price Total
1 10,247.74
5 107,549.85
5 75,005.30
1 91,575.62
9 364,473.09
1 411.50
Material Total 649,263.10
System Cost Index (0.14%) 708.92
SCC Surcharge (4%) 20,254.92
Job Installation Cost 20,963.84
Grand Total 670,226.94

Production Timeline

d
Assembly 19m 9s
1
Ballistic Control System II
Ballistic Control System II M
1 job, 1 run 19m 9s/job 19m 9s
Total Wall Clock Time 19m 9s