Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Sleipnir Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
262,525,812.95
ISK
Sell Value
264,316,425.12
Profit
+1,790,612.17
ISK
Margin
0.7%
Build Time
1d 14h 52m
1 run

Materials

11 items
Material Quantity Unit Price Total
108 3,261,997.44
270 5,807,691.90
10,125 48,064,792.50
405 9,283,304.70
1,620 78,278,319.00
513 14,499,560.25
270 2,563,261.20
21 12,534.06
54 6,320,805.30
Hurricane
1 48,586,451.61
878 36,294,790.34
Material Total 252,973,508.30
System Cost Index (0.14%) 323,024.79
SCC Surcharge (4%) 9,229,279.85
Job Installation Cost 9,552,304.65
Grand Total 262,525,812.95

Production Timeline

d
Assembly 1d 14h 52m
1
Sleipnir
Sleipnir M
1 job, 1 run 1d 14h 52m/job 1d 14h 52m
Total Wall Clock Time 1d 14h 52m