Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Absolution Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
252,476,246.77
ISK
Sell Value
280,311,627.91
Profit
+27,835,381.14
ISK
Margin
9.9%
Build Time
1d 14h 52m
1 run

Materials

11 items
Material Quantity Unit Price Total
270 5,807,365.20
108 3,142,800.00
878 36,507,204.88
405 8,050,719.60
1,620 70,038,043.20
270 2,594,430.00
21 12,534.06
10,125 46,645,875.00
Harbinger
1 50,520,000.00
54 5,977,911.78
513 12,598,048.80
Material Total 241,894,932.52
System Cost Index (0.14%) 357,822.22
SCC Surcharge (4%) 10,223,492.03
Job Installation Cost 10,581,314.25
Grand Total 252,476,246.77

Production Timeline

d
Assembly 1d 14h 52m
1
Absolution
Absolution M
1 job, 1 run 1d 14h 52m/job 1d 14h 52m
Total Wall Clock Time 1d 14h 52m