Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Sabre Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
36,021,781.85
ISK
Sell Value
40,487,537.54
Profit
+4,465,755.69
ISK
Margin
11.0%
Build Time
23h 19m 15s
1 run

Materials

11 items
Material Quantity Unit Price Total
54 1,633,764.60
14 302,474.48
324 15,598,542.60
1,350 6,408,639.00
68 1,558,678.32
Thrasher
1 803,966.67
35 989,248.75
21 199,392.48
9 5,371.74
14 1,639,454.88
135 5,580,634.05
Material Total 34,720,167.57
System Cost Index (0.14%) 44,015.94
SCC Surcharge (4%) 1,257,598.34
Job Installation Cost 1,301,614.28
Grand Total 36,021,781.85

Production Timeline

d
Assembly 23h 19m 15s
1
Sabre
Sabre M
1 job, 1 run 23h 19m 15s/job 23h 19m 15s
Total Wall Clock Time 23h 19m 15s