Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Sabre Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
31,041,528.74
ISK
Sell Value
36,229,255.00
Profit
+5,187,726.26
ISK
Margin
14.3%
Build Time
23h 19m 15s
1 run

Materials

11 items
Material Quantity Unit Price Total
54 1,710,326.88
14 263,146.66
324 12,284,035.56
1,350 6,514,722.00
68 1,137,620.28
Thrasher
1 967,352.20
35 844,936.05
21 192,786.30
9 5,712.21
14 1,794,800.00
135 4,111,581.60
Material Total 29,827,019.74
System Cost Index (0.14%) 41,070.35
SCC Surcharge (4%) 1,173,438.65
Job Installation Cost 1,214,509.00
Grand Total 31,041,528.74

Production Timeline

d
Assembly 23h 19m 15s
1
Sabre
Sabre M
1 job, 1 run 23h 19m 15s/job 23h 19m 15s
Total Wall Clock Time 23h 19m 15s