Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Hulk Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
191,607,725.20
ISK
Sell Value
222,800,000.00
Profit
+31,192,274.80
ISK
Margin
14.0%
Build Time
1d 8h 43m
1 run

Materials

11 items
Material Quantity Unit Price Total
135 1,281,630.60
99 2,129,487.03
14 8,356.04
54 1,549,260.00
203 3,684,182.04
2,700 91,871,604.00
2,700 15,395,400.00
41 3,959,435.60
540 17,733,389.40
203 4,971,508.57
Covetor
1 41,642,244.90
Material Total 184,226,498.18
System Cost Index (0.14%) 249,606.71
SCC Surcharge (4%) 7,131,620.31
Job Installation Cost 7,381,227.02
Grand Total 191,607,725.20

Production Timeline

d
Assembly 1d 8h 43m
1
Hulk
Hulk M
1 job, 1 run 1d 8h 43m/job 1d 8h 43m
Total Wall Clock Time 1d 8h 43m