Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Praetor EV-900 Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
91,302.33
ISK
Sell Value
99,995.78
Profit
+8,693.45
ISK
Margin
8.7%
Build Time
8m 10s
1 run

Materials

6 items
Material Quantity Unit Price Total
7,665 28,667.10
565 32,555.30
9 2,164.05
2 1,487.34
8 11,541.12
4 11,690.32
Material Total 88,105.23
System Cost Index (0.14%) 108.11
SCC Surcharge (4%) 3,088.99
Job Installation Cost 3,197.10
Grand Total 91,302.33

Production Timeline

d
Assembly 8m 10s
1
Praetor EV-900
Praetor EV-900 M
1 job, 1 run 8m 10s/job 8m 10s
Total Wall Clock Time 8m 10s

Required Skills