Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Hel Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
43,707,361,654.42
ISK
Sell Value
0.00
Profit
-43,707,361,654.42
ISK
Margin
0.0%
Build Time
37d 18h 40m
1 run

Materials

18 items
Material Quantity Unit Price Total
45 650,034,200.70
36 389,193,442.56
45 654,642,205.20
135 1,632,150,000.00
45 628,200,000.00
90 1,177,725,287.70
90 1,641,600,000.00
225 1,503,675,000.00
9 130,210,851.06
45 321,570,000.00
90 1,686,185,029.80
45 551,834,230.05
58 773,372,937.86
113 9,321,329,643.18
720 32,933,865.60
360 29,221,261.20
9 1,719,666,666.63
1 20,230,000,000.00
Material Total 43,073,544,621.54
System Cost Index (0.14%) 21,433,426.23
SCC Surcharge (4%) 612,383,606.65
Job Installation Cost 633,817,032.88
Grand Total 43,707,361,654.42

Production Timeline

d
Assembly 37d 18h 40m
1
Hel
Hel M
1 job, 1 run 37d 18h 40m/job 37d 18h 40m
Total Wall Clock Time 37d 18h 40m

Required Skills