Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Dragonfly I Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
5,208,243.86
ISK
Sell Value
5,088,594.16
Profit
-119,649.70
ISK
Margin
-2.4%
Build Time
1h 21m 36s
1 run

Materials

7 items
Material Quantity Unit Price Total
360 889,959.60
450 581,913.00
810 568,425.60
5,400 983,556.00
13,500 663,120.00
40,500 749,655.00
148,500 565,785.00
Material Total 5,002,414.20
System Cost Index (0.14%) 6,960.42
SCC Surcharge (4%) 198,869.24
Job Installation Cost 205,829.66
Grand Total 5,208,243.86

Production Timeline

d
Assembly 1h 21m 36s
1
Dragonfly I
Dragonfly I M
1 job, 1 run 1h 21m 36s/job 1h 21m 36s
Total Wall Clock Time 1h 21m 36s

Required Skills