Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Warrior SW-300 Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
6,959.56
ISK
Sell Value
12,855.06
Profit
+5,895.50
ISK
Margin
45.9%
Build Time
2m 44s
1 run

Materials

4 items
Material Quantity Unit Price Total
856 3,201.44
7 127.96
7 403.34
4 2,974.68
Material Total 6,707.42
System Cost Index (0.14%) 8.53
SCC Surcharge (4%) 243.61
Job Installation Cost 252.14
Grand Total 6,959.56

Production Timeline

d
Assembly 2m 44s
1
Warrior SW-300
Warrior SW-300 M
1 job, 1 run 2m 44s/job 2m 44s
Total Wall Clock Time 2m 44s

Required Skills