Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Aeon Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
44,517,071,552.61
ISK
Sell Value
0.00
Profit
-44,517,071,552.61
ISK
Margin
0.0%
Build Time
37d 18h 40m
1 run

Materials

18 items
Material Quantity Unit Price Total
45 649,800,000.00
36 388,996,721.28
113 1,643,879,315.28
90 1,088,100,000.00
90 1,256,400,000.00
23 300,618,224.80
90 1,641,600,000.00
225 1,503,675,000.00
9 130,210,851.06
45 321,390,000.00
90 1,684,778,443.20
45 551,746,210.05
58 885,154,358.90
113 9,837,215,000.00
720 32,906,332.80
360 29,221,261.20
9 1,719,666,666.63
1 20,230,000,000.00
Material Total 43,895,358,385.20
System Cost Index (0.14%) 21,024,116.77
SCC Surcharge (4%) 600,689,050.64
Job Installation Cost 621,713,167.41
Grand Total 44,517,071,552.61

Production Timeline

d
Assembly 37d 18h 40m
1
Aeon
Aeon M
1 job, 1 run 37d 18h 40m/job 37d 18h 40m
Total Wall Clock Time 37d 18h 40m

Required Skills