Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Mjolnir Rage Torpedo Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
5,988,924.47
ISK
Sell Value
8,125,450.00
Profit
+2,136,525.53
ISK
Margin
26.3%
Build Time
1h 57m 50s
1 run

Materials

5 items
Material Quantity Unit Price Total
119 70,757.40
1 660.90
27 460,581.66
394 4,809,057.62
27 507,497.13
Material Total 5,848,554.71
System Cost Index (0.14%) 4,746.80
SCC Surcharge (4%) 135,622.95
Job Installation Cost 140,369.76
Grand Total 5,988,924.47

Production Timeline

d
Assembly 1h 57m 50s
1
Mjolnir Rage Torpedo
Mjolnir Rage Torpedo M
1 job, 1 run 1h 57m 50s/job 1h 57m 50s
Total Wall Clock Time 1h 57m 50s

Required Skills