Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Mjolnir Javelin Torpedo Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
6,130,681.09
ISK
Sell Value
8,011,750.00
Profit
+1,881,068.91
ISK
Margin
23.5%
Build Time
1h 57m 50s
1 run

Materials

5 items
Material Quantity Unit Price Total
119 117,620.79
1 652.98
27 447,568.20
394 4,842,153.62
27 580,769.19
Material Total 5,988,764.78
System Cost Index (0.14%) 4,799.10
SCC Surcharge (4%) 137,117.21
Job Installation Cost 141,916.31
Grand Total 6,130,681.09

Production Timeline

d
Assembly 1h 57m 50s
1
Mjolnir Javelin Torpedo
Mjolnir Javelin Torpedo M
1 job, 1 run 1h 57m 50s/job 1h 57m 50s
Total Wall Clock Time 1h 57m 50s

Required Skills