Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Rokh Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
149,235,103.07
ISK
Sell Value
161,081,355.93
Profit
+11,846,252.86
ISK
Margin
7.4%
Build Time
2h 43m 12s
1 run

Materials

10 items
Material Quantity Unit Price Total
1 3,108,669.90
68 5,519,571.56
135 6,169,937.40
1,755 5,143,554.00
3,510 5,063,666.40
14,040 10,443,232.80
117,000 28,123,290.00
351,000 20,224,620.00
2,340,000 42,775,200.00
4,680,000 17,503,200.00
Material Total 144,074,942.06
System Cost Index (0.14%) 174,498.20
SCC Surcharge (4%) 4,985,662.81
Job Installation Cost 5,160,161.01
Grand Total 149,235,103.07

Production Timeline

d
Assembly 2h 43m 12s
1
Rokh
Rokh M
1 job, 1 run 2h 43m 12s/job 2h 43m 12s
Total Wall Clock Time 2h 43m 12s

Required Skills