Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Maelstrom Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
137,905,879.89
ISK
Sell Value
160,500,000.00
Profit
+22,594,120.11
ISK
Margin
14.1%
Build Time
2h 43m 12s
1 run

Materials

10 items
Material Quantity Unit Price Total
1 3,075,684.03
68 5,485,120.04
135 6,210,946.35
1,755 4,338,272.25
3,510 4,538,921.40
14,040 9,848,358.00
117,000 21,313,890.00
351,000 17,241,120.00
2,340,000 43,313,400.00
4,680,000 17,784,000.00
Material Total 133,149,712.07
System Cost Index (0.14%) 160,836.59
SCC Surcharge (4%) 4,595,331.22
Job Installation Cost 4,756,167.82
Grand Total 137,905,879.89

Production Timeline

d
Assembly 2h 43m 12s
1
Maelstrom
Maelstrom M
1 job, 1 run 2h 43m 12s/job 2h 43m 12s
Total Wall Clock Time 2h 43m 12s

Required Skills