Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Large Targeting Systems Stabilizer II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
71,413,602.18
ISK
Sell Value
47,000,000.00
Profit
-24,413,602.18
ISK
Margin
-51.9%
Build Time
6h 8m 14s
1 run

Materials

5 items
Material Quantity Unit Price Total
22 20,515.22
27 70,777,726.29
22 285,183.80
1 494.32
27 126,792.00
Material Total 71,210,711.63
System Cost Index (0.14%) 6,861.03
SCC Surcharge (4%) 196,029.52
Job Installation Cost 202,890.55
Grand Total 71,413,602.18

Production Timeline

d
Assembly 6h 8m 14s
1
Large Targeting Systems Stabilizer II
Large Targeting Systems Stabilizer II M
1 job, 1 run 6h 8m 14s/job 6h 8m 14s
Total Wall Clock Time 6h 8m 14s