Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Catalyst Silo Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
167,980.05
ISK
Sell Value
0.00
Profit
-167,980.05
ISK
Margin
0.0%
Build Time
2h 43m 12s
1 run

Materials

1 items
Material Quantity Unit Price Total
1 37,250.00
Material Total 37,250.00
System Cost Index (0.14%) 4,420.82
SCC Surcharge (4%) 126,309.22
Job Installation Cost 130,730.05
Grand Total 167,980.05

Production Timeline

d
Assembly 2h 43m 12s
1
Catalyst Silo
Catalyst Silo M
1 job, 1 run 2h 43m 12s/job 2h 43m 12s
Total Wall Clock Time 2h 43m 12s

Required Skills