Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Angel Control Tower Medium Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
272,150,685.81
ISK
Sell Value
0.00
Profit
-272,150,685.81
ISK
Margin
0.0%
Build Time
9h 4m 1s
1 run

Materials

8 items
Material Quantity Unit Price Total
1 180,400,000.00
1,500,001 5,610,003.74
250,001 4,570,018.28
75,000 4,321,500.00
25,001 6,011,490.45
12,501 9,296,618.67
20,000 28,852,800.00
7,501 21,922,272.58
Material Total 260,984,703.72
System Cost Index (0.14%) 377,593.60
SCC Surcharge (4%) 10,788,388.50
Job Installation Cost 11,165,982.09
Grand Total 272,150,685.81

Production Timeline

d
Assembly 9h 4m 1s
1
Angel Control Tower Medium
Angel Control Tower Medium M
1 job, 1 run 9h 4m 1s/job 9h 4m 1s
Total Wall Clock Time 9h 4m 1s

Required Skills