Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Blood Control Tower Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
553,155,534.98
ISK
Sell Value
1,971,000,000.00
Profit
+1,417,844,465.02
ISK
Margin
71.9%
Build Time
13h 36m
1 run

Materials

8 items
Material Quantity Unit Price Total
3,000,000 11,220,000.00
500,001 9,140,018.28
150,001 8,646,057.64
50,001 12,019,240.38
25,001 18,390,485.59
40,000 57,723,200.00
15,000 44,075,550.00
1 375,900,000.00
Material Total 537,114,551.89
System Cost Index (0.14%) 542,448.70
SCC Surcharge (4%) 15,498,534.39
Job Installation Cost 16,040,983.09
Grand Total 553,155,534.98

Production Timeline

d
Assembly 13h 36m
1
Blood Control Tower
Blood Control Tower M
1 job, 1 run 13h 36m/job 13h 36m
Total Wall Clock Time 13h 36m

Required Skills