Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Guristas Control Tower Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
365,671,953.02
ISK
Sell Value
1,990,000,000.00
Profit
+1,624,328,046.98
ISK
Margin
81.6%
Build Time
13h 36m
1 run

Materials

8 items
Material Quantity Unit Price Total
3,000,000 11,400,000.00
500,001 9,255,018.51
150,001 7,368,049.12
50,001 9,108,682.17
25,001 17,536,951.45
40,000 51,725,600.00
15,000 37,079,250.00
1 210,100,000.00
Material Total 353,573,551.25
System Cost Index (0.14%) 409,124.70
SCC Surcharge (4%) 11,689,277.07
Job Installation Cost 12,098,401.77
Grand Total 365,671,953.02

Production Timeline

d
Assembly 13h 36m
1
Guristas Control Tower
Guristas Control Tower M
1 job, 1 run 13h 36m/job 13h 36m
Total Wall Clock Time 13h 36m

Required Skills